Planning a print job around a hard deadline takes more than ordering a day or two before you need delivery. Turnaround time in the print industry is made up of several stages that stack on top of each other: proof review, production, and shipping transit. Miss any one of them in your planning and the job arrives late.
This guide explains how print turnaround works in Australia: what “working days” covers, which factors extend or shorten a lead time, and how to plan any print job around a firm deadline. It applies across flyers, business cards, labels, corflute signs, and more.
Always check the individual product page for the current quoted production time before confirming a deadline. Turnaround windows shift with order volume, and the live product page is the most accurate source.
Cheat sheet
- Lead time = proof turnaround + production time + shipping transit, counted separately and consecutively
- “Working days” means Monday to Friday, not including weekends or Australian public holidays
- Simple digital print products are fastest; specialty finishes like lamination, foil, and spot UV each add working days
- Higher quantities generally mean longer production time
- Proof approval is within your control and directly affects how quickly your job enters the production queue
- Rush print options are available on selected products for urgent deadlines
- When working to a hard deadline, plan backwards from your must-receive date, not forwards from your order date
What “Working Days” Actually Means
Every Australian print supplier quotes lead times in working days. It is worth understanding what that means in practice.
A working day is any day that falls Monday through Friday and is not a gazetted public holiday. It does not include Saturday or Sunday. And it does not start counting until your proof has been approved and your order is confirmed for production.
In practice, cut-off times matter. If a production cut-off is 2pm and you approve your proof at 4pm on a Wednesday, day one of production may not begin until Thursday morning. Public holidays are another underestimated variable. The calendar varies by state, and a run of public holidays around Easter, ANZAC Day, or end of year can add two to three days to a job without any production delays on the supplier’s side.
How the Proofing Stage Adds Time
Production time is what most buyers focus on, but proof turnaround is where a print job often loses the most ground.
At Paperlust Print Shop, your order does not go to press until a design proof has been reviewed and approved. A proof is prepared from your supplied artwork or customised design, then sent to you before anything is printed. A missed typo caught at the proof stage costs nothing to fix; the same mistake found after a full print run is a much bigger problem.
A proof approved the day it arrives moves your job into the production queue immediately. A proof held for two or three days delays the job by exactly those two or three days. To keep turnaround short: review the proof the same day, have decision-makers ready before you order, and avoid significant design changes after the initial proof is sent.

What Affects Your Production Time
Production time is not a single fixed number. Several factors determine where a job sits within any quoted production window.
Product Type and Complexity
Different products use different equipment and production processes. A standard digitally printed flyer runs on a high-throughput digital press and can complete production in a relatively short window. A corflute plastic sign involves a rigid substrate, different print equipment, and a cutting and finishing step that adds time. A label roll uses a roll-fed press with its own production flow.
Combining multiple product types in one order does not mean everything ships together automatically.
Quantity
More units mean more press time. A run of 50 business cards processes far faster than a run of 5,000. For high-volume orders, allow additional working days and confirm the timeframe directly if your deadline is tight.
Finishes and Coatings
This is the factor most buyers underestimate. Standard digital print is fast because it is a single-pass process. Jobs that include any of the following require additional equipment passes and drying or curing time on top of the base print run:
- Soft-touch or gloss lamination
- Spot UV coating
- Scodix or raised texture treatments
- Flat foil or metallic foil accents
The more finishing steps a job involves, the longer the production window. A laminated business card takes longer to produce than an unlaminated one of the same size and quantity. Plan for this difference before confirming your deadline.
Artwork Readiness
Print-ready artwork with correct bleed, resolution, and colour profiles removes an entire pre-press stage from your timeline. Jobs requiring colour correction or resolution fixes add handling time before a proof can even be sent.

A Rough Guide to Lead Times by Product
General planning ranges only. Check the live product page before committing to a delivery date.
| Product | Typical production range | Key variables |
|---|---|---|
| Flyers | 2-5 working days | After proof approval; standard digital print |
| Standard Business Cards | As fast as 24 hours | Selected stocks; longer for specialty finishes |
| Rectangle Labels | Check product page | Varies by quantity, stock, and roll vs sheet format |
| Corflute Plastic Signs | Check product page | Substrate and cutting/finishing steps add time |
| Any product with specialty finishes | Longer than standard | Lamination, foil, spot UV each add working days |
Production time does not include shipping transit. Allow additional time for delivery after dispatch.
How to Plan Backwards from a Hard Deadline
If you have a fixed event, launch, or campaign date, work backwards from your must-receive date rather than forwards from when you plan to order.
- Confirm your must-receive date. This is when the product must be in your hands. If you need time for stuffing, installation, or distribution after delivery, factor that in.
- Subtract shipping transit time. Flat-rate shipping across Australia typically takes one to several business days. Regional addresses take longer than metro destinations.
- Subtract production time. Use the range shown on the individual product page for the product type and quantity you are ordering.
- Subtract proof turnaround time. Allow at least one working day for the proof to be sent and approved. Add more buffer if multiple stakeholders need to sign off.
- The resulting date is your order deadline. If that date has already passed, contact the Paperlust Print Shop team to ask about rush options before assuming the job cannot be done.

Express and Rush Print Options in Australia
For urgent jobs, some products support expedited production that prioritises your order in the queue. Rush turnaround typically carries an additional charge and is subject to availability. Not every product offers this option.
If you have a tight deadline, contact the Paperlust Print Shop team directly with your product type, quantity, finish requirements, and deadline. They can confirm whether express production is available and advise on a realistic timeframe for your specific job.
Frequently Asked Questions
What does “working days” mean for print turnaround in Australia?
Working days are Monday to Friday, excluding weekends and gazetted public holidays. Production lead times are quoted in working days and do not start counting until your proof has been approved and the order is confirmed for production.
Is production time the same as my total lead time?
No. Total lead time is production time plus proof turnaround time plus shipping transit time. All three stages are consecutive, not simultaneous. A job with a two-day production window still requires proof review time before production begins, and shipping transit time after production is complete.
Do finishes like lamination or foil add to production time?
Yes. Finishes such as soft-touch lamination, gloss lamination, spot UV, foil, and Scodix require additional equipment passes and curing or drying time beyond the base print run. Always allow extra working days for any job that includes specialty treatments, and check the product page for the relevant production window.
Can I get flyers printed and delivered within a week?
Standard flyers have a typical production window of 2-5 working days after proof approval. Whether a full week is enough for production, shipping, and delivery depends on your location, proof approval speed, and current capacity. Contact us directly for urgent deadlines so we can confirm what is achievable.
How do I reduce my total print turnaround time?
The most effective steps are: approve your proof on the day you receive it, supply print-ready artwork with correct bleed and resolution, choose standard digital print over specialty finishes where possible, and place your order well in advance of your deadline. For genuine urgency, ask about rush options at the time of ordering.
Does Paperlust Print Shop deliver across all of Australia?
Yes. Paperlust Print Shop offers flat-rate shipping across Australia. Delivery times vary by location; metro destinations are typically faster than regional areas. International print orders are available on request.